Please ensure Javascript is enabled for purposes of website accessibility
CMO Portal

Know Your Services

STANDARD OPERATING PROCEDURE

Standard Operating
Procedure - Factories

PDF OFFICIAL DOCUMENT PDF Download ↗
DIGITAL RESOURCES

FABOS 2.0

വിവിധ ഓൺലൈൻ സേവനങ്ങളുടെ പബ്ലിക്, വകുപ്പ് ജീവനക്കാർക്കുള്ള യൂസർ മാനുവലുകൾ.

FAB Dual FAQ - Navy Theme
FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS & IT's ANSWERS

Find answers to commonly asked questions about factory registration, licensing, classification, permit approvals, required documents, and application procedures under the Department of Factories & Boilers, Kerala.

01 / REGISTRATION

Frequently Asked Questions Related to Registration

Information regarding factory registration, licensing, and classification.

01 What type of industries should be registered with the Factories & Boilers department and get a license? +
Industries employing three or more workers and carrying out any manufacturing process specified in the Factories Act, 1948 are required to register with the department and obtain a license.
02 How are the factories classified under Factories Act? +
Factories are divided into two categories. The two sections are Section 85 and Section 2(m).
03 Which factories fall under Section 2(m) category? +
Ten or more workers are working in which a manufacturing process is being carried on with the aid of power and whereon twenty or more workers are working in which a manufacturing process is being carried on without the aid of power.
04 Which factories fall under Section 85 category? +
Section 85 includes factories employing 3 to 9 workers using power and 10 to 19 workers without using power.
05 How to apply for factory registration? +
Visit the website www.fabkerala.gov.in and register the occupier using the new registration link. Then enter factory details, Form 2 clearly and correctly, upload required documents, pay the fee online, and submit the application.
02 / PERMIT

Frequently Asked Questions Regarding Permits

Information regarding factory permit approval, applications, documents, and plans.

01 Which type of industries require the Factory Permit Approval from the Department of Factories & Boilers, Kerala? +
Any of the industries employing more than 10 workers requires factory permit approval before applying for registration. Factories employing less than 10 workers shall obtain registration and license according to the notification under Section 85 of the Factories Act, 1948.
02 How can one apply for the Permit Approval? +
The user shall take One Time Registration through the official website of the Department (www.fab.kerala.gov.in) and apply online for the Permit Approval along with mandatory documents.
03 Which are the mandatory documents to be submitted along with the online application for Permit Approval of a factory? +
  1. A flow chart of the manufacturing process supplemented with a brief description of the process in its various stages. The flow chart shall be duly signed by the Factory Occupier.
  2. The site plan showing the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.
  3. The building plan showing the plan, elevation and necessary cross-sections of the various buildings, indicating all relevant details relating to natural lighting, ventilation, along with detailed drawings of structures like chimney, rainwater harvesting system, septic tank and soak pit, etc.
  4. The machinery layout plan clearly indicating the position of the plant and machinery, aisles and passageways.
  5. The plans of fire layouts with legends of firefighting equipment clearly indicating the position and distribution of various fire protection and preventive measures in various buildings as well as in the factory site with means of escape in case of fire.
  6. In the case of hazardous and polluting industries, with their respective manufacturing process notified under Schedule 1 of Section 2(cb) of the Factories Act, 1948, a certificate of approval of location of the factory obtained from the Chief Town Planner to Government and a consent letter from the Kerala State Pollution Control Board.
  7. In case of Major Accident Hazardous (MAH) factories, the approved order from the Government of Kerala as per Section 41A of the Factories Act, 1948.
  8. Permit fees paid under Treasury Head of Account 0230-00-104-99 through the E-Treasury.
  9. Online Application with Form 1 Application and all other details duly filled.
04 Who is authorized to prepare and certify plans for the purpose of Factory Permit? +
The plans prepared for the purpose of Factory Permit shall be prepared only by a Department Approved Draftsman. All the plans shall be certified and signed by the Department Approved Draftsman as well as by the Factory Occupier. The list of Approved Draftsmen is available on the official website.
05 What is the validity of a Factory Permit approved by the Department of Factories & Boilers? +
One year from the date of approval.
STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE - Boiler

ബോയിലറുമായി ബന്ധപ്പെട്ട നടപടിക്രമങ്ങളും സേവന വിവരങ്ങളും ഒരൊറ്റ ഇടത്തിൽ.

PDF DOCUMENT Download ↗
മറ്റുള്ളവ
DOCUMENTS & RESOURCES

Others

ബോയിലറുമായി ബന്ധപ്പെട്ട മറ്റ് പ്രധാന രേഖകളും ഉത്തരവുകളും.

Frequently Asked Questions

Frequently Asked Questions on Boiler

Find answers to frequently asked questions regarding boiler registration, erector recognition, welder certification, competency registration, mandatory documents, and boiler certificate validity.

Boiler Services FAQ / HELP
01
Which are the mandatory documents to be submitted along with the online application for the new competency registration?
Scanned copy of documents to prove the age.
Scanned copy of original educational qualification certificates.
Scanned copies of experience certificates showing the details of areas of responsibilities.
Details of facilities available for conducting tests and examinations.
02
Which are the mandatory documents to be submitted along with the online application for the new Erector recognition?
  1. Scanned copies of original qualification and experience certificates of the Supervisor shall be uploaded.
  2. Scanned copies of original valid IBR Welder Certificates shall be uploaded.
  3. In the case of welders holding other state certificates, the certificates must be endorsed for validity in the state of Kerala.
  4. Details of facilities such as workshops and fabrication yards.
  5. Details of tools, equipment, accessories, safety gadgets, and Personal Protective Equipment (PPE).
  6. Affidavit of the firm in the format prescribed by the Department.
03
Whether the welder certificate issued by another state is valid in Kerala without endorsement?

No. Only certificates endorsed for validity in the state of Kerala are valid.

04
Is it necessary to get the boiler registered?

As per Section 7 of the Boilers Act, 1923, it is mandatory to get the boiler registered.

05
What is the validity period of the certificate of a boiler?

The certificate of a boiler is issued for a period of one year from the date of inspection, after carrying out the inspections and tests prescribed as per the technical standards laid down in the Indian Boiler Regulations, 1950 (IBR - 1950).

ഫോമുകൾ:

വകുപ്പുമായി ബന്ധപ്പെട്ട ഫോമുകൾ ലഭിക്കുന്നതിനായി

കൂടുതൽ കാണുക →

Acts & Rules

Acts

  • 1948

    The Factories Act, 1948 — Malayalam

    Central Act
  • 1948

    The Factories Act, 1948 — English

    Central Act
  • 1923

    The Indian Boilers Act, 1923

    Central Act
  • 1986

    The Environment Protection Act, 1986

    Central Act
  • 1936

    The Payment of Wages Act, 1936

    Central Act
  • 1961

    The Maternity Benefit Act, 1961

    Central Act
  • 1983

    The Dangerous Machine (Regulation) Act, 1983

    Central Act
  • 1988

    The Labour Laws (Exemption From Furnishing Returns and Maintaining Registers by Certain Establishments) Act, 1988

    Central Act
  • 1967

    The Unregistered Cashewnut Factories (Prohibition) Act, 1967

    State Act
  • 1996

    The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996

    Central Act

Rules

  • 2011

    The Boiler Attendant Rules, 2011

    State Rule
  • 2021

    The Boiler Operation Engineers Rules, 2021

    State Rule
  • 1957

    The Factories Rules, 1957

    State Rule
  • 1967

    The Kerala Boiler Rules, 1967

    State Rule
  • 1957

    The Kerala Factories (Welfare Officers) Rules, 1957

    State Rule
  • 2003

    The Kerala Factories (Major Accident Hazard Control) Rules, 2003

    State Rule
  • 1957

    The Kerala Economiser Rules, 1957

    State Rule
  • 1990

    The Kerala Dangerous Machines (Regulation) Rules, 1990

    State Rule
  • 1937

    The Payment of Wages (Procedure) Rules, 1937

    State Rule
  • 1958

    The Kerala Maternity Benefit Rules, 1958

    State Rule
  • 1986

    The Environment (Protection) Rules, 1986

    State Rule
  • 1987

    The Manufacture, Storage and Import of Hazardous Chemicals Rules, 1987

    Text unavailable
    Not yet published
  • 1989

    The Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989

    State Rule
  • 1996

    The Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996

    State Rule
Directorate of Factories & Boilers  ·  Government of Kerala

FABOS - വീഡിയോ ട്യൂട്ടോറിയൽ

യൂസർ രജിസ്‌ട്രേഷൻ

നിലവിലെ ബോയിലർ പുതുക്കൽ, റിപ്പയർ

കോംപീറ്റന്റ് പേഴ്സൺ

പുതിയ ബോയിലർ ആഡ് ചെയ്യുവാൻ

പുതിയ പെർമിറ്റ് അപേക്ഷ

പുതിയ ഫാക്ടറി ആഡ് ചെയ്യുവാൻ

Third party inspection module | Video tutorials

Profile Setup Institution

Application Processing

Adding Competent Persons in Institution

Introducing To Tabs In Competent Person

Application Submission | Third Party Inspection

Sending Intimation

Application Submission & History

Pull Back Application

Profile Setup Individual

Submission of Intimation Dates

Application Renewal

After Closing the Application